Eric Vincent, Product Designer

Systems, research, and product strategy — built to hold up under real complexity.

I've been the only designer in the room, and one of nine designers aligned around a single component library at Southwest. The case studies below span a pre-seed startup, a consumer growth brand, and two Fortune 500 enterprises, including a regulated airline. Different stakes every time, same approach: understand the real constraint before designing around it.

Three tracks running in parallel, August to December 2026 A timeline of August to December 2026 with three lanes. Foundation: the component library, raised with the CEO in May 2025 and tracked in Linear since January 2026, continuing throughout and beyond. Roadmap: thirteen scheduled projects, three launched and ten undisclosed, overlapping from late July through late December. Business story: pitch concepting from July 15, then fourteen dated pitches between August 14 and September 8, with six more dates to be confirmed. Aug 2026 Sep Oct Nov Dec Foundation Component library Roadmap Features and projects Business story Pitches Since May 2025 · rebuilt inside feature work continuing Raised with the CEO in May 2025 · tracked in Linear since Jan 2026 13 scheduled projects (Linear) AI Compliance Add Vendors White Label Undisclosed Undisclosed Undisclosed Undisclosed Undisclosed Undisclosed Undisclosed Undisclosed Undisclosed Undisclosed From Jul 15, squeezed between feature work 14 dated pitches 6 more, TBC Today Done Ongoing or planned A pointed end continues beyond the window Unreleased feature names omitted
How I Operate

Operating Across Initiatives

Three business-critical priorities, one small team: fixing the foundation, building the roadmap, and supporting the story told to investors and publishers, without letting any of them stall the others.

PrioritizationSequencingDesign SystemsRoadmappingEngineering ScopingPitch Support

Not a case study. How I prioritize across them.